LocationSiirt Province, Botan Stream, a tributary of the Tigris River
Installed Capacity420.10 MWe (4 Units)Generation (01.01-30.09.2024)1,195,556 MWh
Lisans Dönemi06.09.2018’den itibaren 39 yıl 8 ay 29 gün
Start of Operation2020
Kalite BelgeleriISO 10002, ISO 9001, ISO 27001, ISO 14001, ISO 50001, ISO 45001.
Carbon CertificatesCercarbono